ROADMAP · WHERE IT STANDS

Software first. Hardware next.

● CURRENT STAGE
R&D: code, simulation, testing and benchmarks (mid P0: safety core and simulated bench)
P0 · IN PROGRESS

SOFTWARE AND SIMULATION

  • The brain and the module protocol
  • Sandboxed plugins
  • Interlock and hazard classes
  • Public attack list and regression tests
  • Benchmarks
P1 · NEXT

PROVE THE INTERLOCK ON THE BENCH

  • Bench-only hardware, nothing built for the field
  • P1.1 to P1.6: the brain, build tools, RP2350 trust root, ground truth, bus guard, bench evidence
  • Independent watchdog cut, operator panel and a lamp or resistor load
  • Six exit tests, each with recorded evidence
AFTER P1

FUNDING AND CREDITS

  • Applications for free usage, credits and funding
  • Built on the P1 bench data and the technical report
  • Does not start before P1 exits
P2 · LATER

MAKE IT MOBILE

  • P2.1 to P2.5: the pack, the modules and field use
  • The S.A.W. (Sensory Agent Workstation): case, battery, cooling, indicators
  • DC meter and listen-only comms pod, then the investigation
  • More modules: vehicle port, microphones, radio, T.A.B.L.E. camera
P3 AND LATER

NAMED, NOT BROKEN DOWN

  • Analog capture, the thrust stand, the site port
  • Senses: sound, vision, thermal, air
  • The vehicle
RESEARCH PAPER

THE TECHNICAL REPORT

  • Published now on this site
  • arXiv or formal submission only after the P1 hardware data
The hardware design goes through repeated independent safety reviews, and hardware checks in CI test the design data. P1 parts are ordered only after the review loop comes back clean. Nothing has been built in hardware yet.
P2 · ON THE T.A.B.L.E.
T.A.B.L.E. CAMERA
An optional overhead camera the agent watches. Opt-in, local-only by default, look-only: it can see, never act.
No dates. Each milestone ships with a write-up when it is done.